当前位置:才华咖 > 国家语言 > 英语 > 商务英语 > 2016年下半年初级商务英语考试练习题精选
手机版

2016年下半年初级商务英语考试练习题精选

来源:才华咖 阅读:2.65W 次

转眼2016下半年商务英语考试即将来临,不少同学也正在准备2016下半年商务英语考试,以下是yjbys网小编整理的关于商务英语初级练习题精选,供大家备考。

2016年下半年初级商务英语考试练习题精选

Questions 8-12

l Read this memorandum.

l Choose the best sentence from the list A – I to fill each of the blanks.

l For each blank (8 - 12) mark one letter (A - I) on your Answer Sheet.

l De not mark any letter twice.

l One answer has teen given as an example.

MEMORANDUM

To: Filma Williams, school of Architecture

From: Ram S. Johnson, Physical Plant Operations

Subject: Air-conditioning Installation Costs for East Hall.

Date: 4.4.94

As you requested in your memo of March 15, we have studied the costs of installing air conditioning for the seven offices and two studio classrooms in East Hall ____ Example ____

Office and Classroom installation

Estimates were obtained from three contractors on the costs of covering the offices and classrooms ____ 8 ____ The work would take about three weeks.

Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period ____ 9 ____ Sheet metal work to build out lest in the classes could be dine on weekends, and the overtime labour costs of about $ 1,500 have been included in the estimates.

Arrangements were not made to do the office space installation on weekends … 10 …

Additional Installation

Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. ____ 11 ____ If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way ____ 12 ____

Summary

The total job for the building would be about $ 35,000 if done at one time. A two-stage installation would cost about $55,000. I can get official bids at your request.

Example: A

A. As you suggested, we also sought information on the additional cost of air conditioning in the entrance halls and stairways.

B. All these three were in the $ 20,000 to $ 25,000 range.

C. This later installation would cost about $20,000.

D. However, class interruption should be minimal.

E. In the same way, each of these three would take at least one month.

F. Therefore, the total cost was this $6,000 plus another $5,000.

G. Labour costs would be an additional S 5,000, bringing the total cost of the addition to $11,000.

H. Each faculty member could expect to have workers in office for about one day.

I. So faculty members can continue their office work as usual.

8.B

9. D

10. H

11. G

12. C

本文链接:https://www.caihuaka.com/yyzs/shangwu/j2vznm.html

Copyright © 2024. 才华咖 All right reserved. 浙ICP备20120231号-3

文字美图素材,版权属于原作者。部分文章内容由网友提供推送时因种种原因未能与原作者联系上,若涉及版权问题,敬请原作者联系我们,立即处理。